<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>GreenGrid India</title><description>GreenGrid India is an independent publication covering India’s renewable energy sector — solar, wind, storage, green hydrogen, manufacturing and policy — with a new article every Sunday.</description><link>https://greengrid-india.vercel.app/</link><item><title>ALMM List-II is here: what the solar cell mandate means for developers</title><link>https://greengrid-india.vercel.app/articles/almm-list-ii-solar-cell-mandate/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/almm-list-ii-solar-cell-mandate/</guid><description>From June 2026, government-backed solar projects must source not just modules but also cells from approved domestic manufacturers. Here’s what the change does — and where it bites.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Policy &amp; Markets</category></item><item><title>Green hydrogen meets steel: government invites bids for pilot projects</title><link>https://greengrid-india.vercel.app/articles/green-hydrogen-steel-pilot-bids/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/green-hydrogen-steel-pilot-bids/</guid><description>MNRE and the Ministry of Steel are seeking pilot projects that use green hydrogen in steelmaking — a small step aimed at one of India’s hardest-to-abate sectors.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Hydrogen</category></item><item><title>Gujarat’s new industrial policy puts clean energy manufacturing at the centre</title><link>https://greengrid-india.vercel.app/articles/gujarat-industrial-policy-clean-energy/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/gujarat-industrial-policy-clean-energy/</guid><description>Renewable equipment, battery storage, green hydrogen and nuclear equipment are named priority sectors in Gujarat’s latest industrial policy — a bid to own the supply chain, not just the generation.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Policy &amp; Markets</category></item><item><title>The state race: Gujarat leads H1 2026 solar with 7.6 GW, Rajasthan close behind</title><link>https://greengrid-india.vercel.app/articles/gujarat-rajasthan-lead-h1-solar-additions/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/gujarat-rajasthan-lead-h1-solar-additions/</guid><description>Two western states accounted for more than half of India’s solar additions in the first half of 2026. Tamil Nadu was a distant third.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Solar</category></item><item><title>India’s battery storage fleet grows eleven-fold in six months</title><link>https://greengrid-india.vercel.app/articles/india-bess-capacity-11x-jump/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/india-bess-capacity-11x-jump/</guid><description>Operational battery energy storage climbed from 0.78 GWh in December 2025 to about 8.7 GWh by June 2026, with 10 GW under construction and roughly 20 GW in active tendering.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Storage</category></item><item><title>Batteries, EVs and a hint of hydrogen: takeaways from India Energy Storage Week 2026</title><link>https://greengrid-india.vercel.app/articles/india-energy-storage-week-2026-takeaways/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/india-energy-storage-week-2026-takeaways/</guid><description>The 12th edition of IESW brought delegates from 15 countries to New Delhi from July 8–10, with the mood shifting from “whether storage” to “how much, how fast”.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Storage</category></item><item><title>India adds a record 29 GW of solar and wind in the first half of 2026</title><link>https://greengrid-india.vercel.app/articles/india-record-29-gw-solar-wind-h1-2026/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/india-record-29-gw-solar-wind-h1-2026/</guid><description>Utility-scale solar led the way with around 19 GW of new capacity between January and June, up roughly a third year on year, as India’s cumulative renewable capacity reached about 288 GW.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Solar</category></item><item><title>India’s solar fleet crosses 157 GW as renewables reach 42.5% of power capacity</title><link>https://greengrid-india.vercel.app/articles/india-solar-157-gw-re-share-42-percent/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/india-solar-157-gw-re-share-42-percent/</guid><description>A snapshot of where the 288 GW renewable fleet stands — what’s in it, how fast each piece is growing, and how far 500 GW by 2030 remains.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Solar</category></item><item><title>Modules at 172 GW, cells at 27 GW: the lopsided rise of Indian solar manufacturing</title><link>https://greengrid-india.vercel.app/articles/india-solar-manufacturing-172-gw-modules-27-gw-cells/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/india-solar-manufacturing-172-gw-modules-27-gw-cells/</guid><description>India’s module capacity has grown from 3 GW a decade ago to about 172 GW today. The harder, more capital-intensive layers of the supply chain are only now catching up.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Manufacturing</category></item><item><title>Kerala fast-tracks 750 MW of battery storage to steady its grid</title><link>https://greengrid-india.vercel.app/articles/kerala-750-mw-bess-push/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/kerala-750-mw-bess-push/</guid><description>A power-importing state with an evening-peak problem is turning to batteries — Kerala is accelerating 750 MW of BESS projects to firm up its renewable supply.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Storage</category></item><item><title>MNRE’s budget rises 30% to ₹32,914 crore</title><link>https://greengrid-india.vercel.app/articles/mnre-budget-32914-crore/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/mnre-budget-32914-crore/</guid><description>The renewable energy ministry’s allocation grew nearly a third, with solar schemes, grid storage, green energy corridors and the hydrogen mission taking the lion’s share.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Policy &amp; Markets</category></item><item><title>Jakson and Super Circle joint venture Navurja to build India’s largest solar encapsulant film plant near Bhopal</title><link>https://greengrid-india.vercel.app/articles/navurja-jakson-super-circle-solar-encapsulant-facility/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/navurja-jakson-super-circle-solar-encapsulant-facility/</guid><description>Nayurja Bharat Pvt. Ltd. is investing ₹1,000 crore in a solar component manufacturing complex at Mohasa-Babai in Madhya Pradesh, starting with encapsulant film capacity of 3 GW, scalable to 10 GW.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Manufacturing</category></item><item><title>Rooftop solar doubles: PM Surya Ghar delivers 6.4 GW in six months</title><link>https://greengrid-india.vercel.app/articles/pm-surya-ghar-rooftop-solar-doubles/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/pm-surya-ghar-rooftop-solar-doubles/</guid><description>India’s rooftop segment added around 6.4 GW in the first half of 2026, up 104% year on year, making it the fastest-growing slice of the solar market.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Solar</category></item><item><title>SECI floats 700 MW ISTS solar tender for Odisha C&amp;I demand</title><link>https://greengrid-india.vercel.app/articles/seci-700-mw-ists-solar-tender-odisha/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/seci-700-mw-ists-solar-tender-odisha/</guid><description>The Solar Energy Corporation of India has invited bids for 700 MW of inter-state transmission connected solar, to be built on a build-own-operate basis with 25-year PPAs.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Policy &amp; Markets</category></item><item><title>Solar-plus-storage tariffs are now knocking on coal’s door</title><link>https://greengrid-india.vercel.app/articles/solar-plus-storage-vs-new-coal/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/solar-plus-storage-vs-new-coal/</guid><description>Recent SECI auctions have cleared solar-with-storage bids at levels analysts describe as competitive with new coal plants — a threshold with big implications for what India builds next.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Storage</category></item><item><title>Wind’s slow half: 2.9 GW in H1 2026 as solar races ahead</title><link>https://greengrid-india.vercel.app/articles/wind-slowdown-h1-2026/</link><guid isPermaLink="true">https://greengrid-india.vercel.app/articles/wind-slowdown-h1-2026/</guid><description>India added about 2.9 GW of wind between January and June, down 16% year on year — a soft patch in an otherwise record-breaking half for renewables.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Wind</category></item></channel></rss>